Thin-layer system · DIY installation instructions · Old building

Thin-Layer System Installation Instructions: Installing Underfloor Heating in an Old Building

The complete installation instructions for the thin-layer system: Check the subfloor, lay the self-adhesive dimpled sheet, clip in the heating pipe, pressure test, pour Planogel Rheo. Total build-up from 18 mm. Still in the planning phase or unsure which variant is suitable? → First, read our planning guide for costs, variants & subfloor requirements.

⏱ 8 min. read
DIY Assembly Instructions
Old Buildings & Renovation

What do I need? Materials, tools & substrate requirements

Required materials

  • →Dimpled membrane – NP12 (13 mm), NP14 (15 mm) or NP16 (17 mm)
  • →PE-RT heating pipe Ø 12, 14 or 16 mm suitable for the foil variant
  • →Kerakoll Planogel Rheo self-levelling compound (min. 5 mm cover)
  • →Reinforced perimeter insulation strip, self-adhesive, min. 50 mm high
  • →Heating circuit manifold + pressure gauge for pressure test (4 bar)
  • →2 m straightedge, moisture meter (wood max. 15%), spiked roller, mixing pump

Substrate requirements

  • →Load-bearing substrate: Cement screed, tiles (no hollow sound) or wood
  • →Flatness ≤ 3 mm over 2 m – if more, apply leveling compound first
  • →Dry and clean: no oil, no loose dust, no wet spots
  • →Heating system with ≤ 45 °C flow temperature – optimal for heat pump (35–40 °C)
  • →Door undercut to be measured in advance: NP12 → min. 23 mm, NP14 → min. 25 mm, NP16 → min. 27 mm
  • →Hydraulic balancing: legally mandated since October 1, 2024 (GEG §60a) for every new heating system – Procedure B mandatory for heat pumps

Which version fits? NP12, NP14, or NP16

Your choice depends on your door undercuts – this is the decisive factor. Beforehand, measure the distance between the bottom edge of the door and the existing floor. NP12 results in the slimmest construction: 13 mm film + 5 mm screed = 18 mm total. This means most old building doors will fit without needing to be shortened. NP14 (20 mm) and NP16 (22 mm) offer slightly more thermal storage mass. For old buildings with a tight budget and limited room height, NP12 is the first choice. Set the position of the heating circuit distributor: plan for a wall niche or a flush-mounted box – the distributor requires approx. 30 cm × 60 cm.

Underfloor Heating in Old Buildings: 5 Steps to a Finished Heating System

1

Check & prepare the substrate: Lay down a 2 m straightedge – deviation > 3 mm? Then apply leveling compound (e.g., Kerakoll Levelite) and let it cure for 24 h. Tap tiles: Hollow sound = risk of cracks in screed → fill. Measure wood moisture (max. 15 %). Vacuum, degrease subfloor. Duration approx. 30–60 min.

2

Install edge insulation strips all around: Adhere reinforced edge insulation strips to every wall, pillar, and door frame – without gaps. The reinforcement holds back the screed and prevents sound bridges. Only trim the top of the strips after the screed has fully cured. Warning: Without edge insulation strips, the screed can crack! Duration approx. 20 min.

3

Laying self-adhesive studded sheeting: Peel off the protective film, starting from a corner or from the manifold. Interlock the sheets laterally over the snap fasteners – they will audibly click into place. No adhesive necessary: the dimpled sheet adheres to screed, tiles, and wood. Butt the sheets together, do not overlap. Mark the pipe run with chalk. Duration approx. 45 min/20 m².

4

Install heating pipe & pressure test: Clip PE-RT pipe by hand into the studs – no tools required. Spiral shape: more even, edge area remains cooler. Meander: easier to install. Max. 70 m per heating circuit (12 mm pipe). Connect pipe ends to manifold. Pressure test: 4 bar cold pressure, hold for 24 h, photograph result. Heating runs continuously during the entire screed installation! Duration approx. 60–90 min/heating circuit.

5

Pour and cure Planogel Rheo: Mixing pump recommended for consistent viscosity. Apply compound quickly - at least 5 mm above the pipe crown. Roll with a spiked roller crosswise + lengthwise: air bubbles escape, surface becomes smooth. Self-leveling - no smoothing necessary. Drying time: walkable (light traffic) after 24 h, ready for flooring after 7 days. Attention: No heating in the first 28 days! Duration approx. 1–2 h/20 m².

Caution – Screed only by a professional

The pouring of Planogel Rheo screed should only be carried out by a qualified specialist company. Errors in the mixing ratio, covering thickness or processing temperature can lead to cracks, voids and system damage – and will invalidate the warranty. Laying dimpled sheeting and heating pipes: DIY possible. Applying screed: hire a professional.

Checklist: Before casting, check

✓ Pressure test passed (4–6 bar, 24 h, protocol photographed) · ✓ Edge insulation strips completely glued · ✓ All pipe ends connected to the manifold · ✓ Substrate moisture < 2% · ✓ Room temperature 5–30 °C · ✓ No open joints or penetrations · ✓ Film completely glued without bubbles. Only start grouting when all points are fulfilled.

Frequently Asked Questions about Thin-Film System Installation

Rule of thumb: the door gap is decisive. NP12 + 5 mm screed = 18 mm total height – fits under most old building doors (standard gap 20–25 mm). NP14 = 20 mm, NP16 = 22 mm. Larger foil = more thermal mass = slightly more even heat. If space is tight, always choose NP12. Beforehand, test the doors by propping them up with a 20 mm thick board.
For 12 mm PE-RT pipe, a maximum of 70 running meters. For 14 mm up to ~90 m, for 16 mm up to ~100 m – depends on pressure loss. Rule of thumb for room size: 1 heating circuit per 15–20 m² (with 10 cm spacing). Always keep multiple heating circuits of the same length (± 10 m) so that the manifold can balance evenly.
Yes – if the tiles are completely secure. Test: tap with a rubber mallet, hollow sound = adhesion lost → patch these tiles beforehand or re-bond them. Then degrease the surface (brake cleaner or soapy water), and let it dry. The self-adhesive underside of the dimpled sheet will then adhere reliably.
At the earliest 28 days after screed installation. Then start the heating protocol: Day 1–3 flow temperature at 25 °C, daily +5 °C until operating temperature is reached. Only then lay the floor covering. Warning: Heating too early will cause Planogel Rheo to crack. This protocol is mandatory for the warranty.
All common floor coverings are possible: tiles & natural stone (best heat transfer), vinyl/LVT, laminate, floating parquet. Carpet: total resistance ≤ 0.15 m²K/W. Solid wood planks glued directly: only after consultation with MC Therm (observe wood moisture, laying direction). PVC glued directly works very well.
With NP12 (18 mm total height) usually not – standard door undercut is 20–25 mm. With NP16 (22 mm) or an additional insulation board, it might be tight. Check doors beforehand: place a 20 mm board underneath as a test and open the door. Plan stairs and door thresholds early.
Engineered wood flooring (2-layer): yes – if approved for underfloor heating, glued directly to the screed. Suitable wood types: oak, walnut, bamboo. Not suitable: beech, cherry (too much shrinkage). Solid wood planks: only after manufacturer approval. Vinyl/LVT is the easiest and safest choice.
Yes – provided the gas heating system is designed as a condensing boiler (flow temperature adjustable to 35–45 °C). Older high-temperature boilers require a mixing group or hydraulic balancing. For a heat pump, a thin-layer system is immediately optimal – no conversion necessary.

Pour Planogel Rheo evenly over the surface and immediately spread it with a long squeegee. Then roll a spike roller (deaeration roller) crisscross and lengthwise over the entire surface – this pushes out trapped air around the pipes. Work carefully, especially at corners, pipe bends, and distributor connections. Air pockets are the most common error: They form voids and permanently reduce heat transfer.

Start heating no earlier than 48 hours after pouring – this is the minimum curing time for Planogel Rheo. Then start the heating protocol: Day 1–3, limit flow temperature to 25 °C, increasing daily by 5–10 °C until operating temperature is reached. Premature heating creates vapor pressure in the still-soft screed → bubbles, cracks, hollow spots. Adhering to the protocol is mandatory for the manufacturer's warranty.

Yes, absolutely. Fill the system with water, bleed it completely, then bring it to a test pressure of at least 4–6 bar. Maintain the pressure steadily for 24 hours. Document the result (manometer photos). Only then proceed with pouring. Leaks after pouring are extremely difficult to locate (screed milling, damage to flooring) – and the warranty is void if a pressure test is not performed.

Yes – since October 1, 2024, a legal requirement (GEG §60a) for every new heating system. For heat pump combinations, procedure B is mandatory (room-by-room calculation). Without balancing: no KfW funding, and the heat pump operates inefficiently. Costs in a single-family home: approx. €600–1,000 by a specialist company. Result: even heat distribution in all rooms, optimal COP of the heat pump.

MC Therm supplies thin-layer system as a complete set: studded mat, PE-RT heating pipe, edge insulation strip and manifold – precisely calculated for your floor plan. Volume discount 3–10% from 30 m². Free technical consultation included.

Configure complete set for my project →

Ready for assembly?

Thin-layer complete set – from 18 mm height

Self-adhesive on screed, tiles & wood. Heating pipe clips in. Planogel Rheo self-levels. No chiseling, no dismantling.